ປະ​ເພດ​ຄຳ​ຮ້ອງ
Patent - Foreign
ປະ​ເພດ​ຄຳ​ຮ້ອງຍ່ອຍ
Patent - PCT National Phase
(10) ເລກທີ ແລະ ວັນທີການຈົດທະບຽນ
ສະຖານະ
Filed
(180) ມື້​ໝົດ​ອາຍຸ
(20) ​ເລກທີ ​ແລະ ມື້ ຍື່ນ​ຄຳ​ຮ້ອງ
LA P/891 03.09.2021
(40) ​ເລກທີ ​ແລະ ວັນ​ທີ​ເຜີຍ​ແຜ່
(86) ເລກທີ ແລະ ວັນທີ ເອກະສານ PCT
(87) and Date ເລກທີ ແລະ ວັນທີ່ ເຜີຍແຜ່ PCT
(85) ວັນ​ທີເອກະສານ​ເຂົ້າ
(30) ລາຍລະອຽດບຸລິມະສິດ
(51) ການຈັດ​ໝວດ​ໝູ່ IPC
(74) ຊຶ່ບໍລິສັດຕົວແທນ
(LA) Tilleke & Gibbins Lao Co., Ltd : No. 302, 3rd Floor, Vieng Vang Tower, Unit 15, Boulichan Road, Dongpalan Thong Village, Sisattanak District, Vientiane Capital, Lao PDR
(54) ຫົວຂໍ້
(LA) LOW CAPITAL AND OPERATIONAL COST E-COMMERCE LOGISTICS SYSTEM
(EN) LOW CAPITAL AND OPERATIONAL COST E-COMMERCE LOGISTICS SYSTEM
(57) ບົດສັງເຂບ
(LA)

The present invention discloses a disruptive low capital and operational cost logistics system and method that provides for fast and massive delivery of e-commerce merchandise, including same day delivery, of thousands of items and packages, in extensive geographical areas, such as whole states, countries and continents, reducing the need for building, operating, or using multiple fulfillment warehouses located near the consumers as in l0 traditional e-commerce logistics, creating a revolution in the e-commerce industry worldwide. l5 In a disruptive manner, the systems and methods of the present invention facilitate the logistics for e-commerce delivery processes, and also may allow at the same time reducing the use of massive quantities of cardboard packages that are used for protection and containment for e-commerce orders, being sustainably beneficial for the e-commerce market, the environment, and the consumer. This is achieved by the use of multibox packages that are configured to contain a set of products including orders from different consumers and not necessarily having individual packages for individual consumers, where such multibox packages are sorted at the origin in a Central Fulfillment Center.

(58) ການ​ຮຽກຮ້ອງ
ປະເພດຂອງເອກະສານ ວັນທີ ການດໍາເນີນການ
ຊື່ຂອງລາຍການວັນ​ທີສະຖານະ
Filing03.09.2021Filed
PCT National Phase Entry03.04.2023PCT National Phase